Flooding of Maidenbower/Furnace Green bridleway
Flooding of Maidenbower/Furnace Green bridleway / Announcements / Who is responsible? / Comments
Guest |
#12014-02-04 12:26The old bridge is more elegant than the new structure but it may well be necessary to replace it if it is structurally unsound. |
Guest |
#22014-02-04 12:29Tabiba, yes, NR should inspect the bridge to determine whether the leaks are a serious problem, and fix if so, but ultimately it's the drainage that is the real problem that needs sorting out. Water will enter the dip along the path from both ends even if it isn't leaking through the bridge. Personally I don't think major reconstruction of the bridge is necessary or feasible. As others have said, the old part of the bridge is more elegant anyway.
Thanks for your efforts on this.
|
AngryBird Guest |
#32014-02-04 12:31Hi |
Guest |
#42014-02-04 12:36Yes I agree, NR should inspect the Bridge, to check for any structural repairs. And if there are repairs needed they should be done promptly before there is an accident. |
Ian |
#52014-02-04 13:01I suspect network rail have already inspected the bridge, but if it is unsound obviously work should be done. It has had water coming through for some time... Preference should be put on providing an economic and effective solution to the flooding - improved drainage or raising the level of the path under the bridge to eliminate the depression there entirely. |
Guest |
#62014-02-04 13:03Yes I agree an inspection should be requested to investigate the leaks and to devise a permanent solution such as a storm drain within the tunnel that connects to the stream or a soak away. I prefer the architectural style of the old bridge and find the new bridge ugly so I wouldn't like to see the old bridge revamped unless it was necessary on safety grounds. I would like them to address the poor lighting throughout though. |
Guest |
#72014-02-04 14:06You can suggest it. What I am most concerned about is that the flooding is regular, and will they be returning every time to pump it out, especially when they have finished works? No. They need a permanent solution. |
Guest |
#82014-02-04 14:08Thanks for all your help with this. I would hope that there is nothing wrong with the old bridge - if there is, and they have just stuck a new bit on it, without checking, that would be awful. Concerned re pumping as it sounds like a temporary solution - what about a raised walkway at the sides? |
Guest |
#102014-02-04 16:15Yes, it is imperative for a long term solution to be found. The whole area is in need of an up-grade in order to ensure the future safety of the public including the children and young people who have little option but to use the bridleway. |
Mel |
#112014-02-04 16:45I would doubt the old bridge is structurally unsound there must be regular inspections on railway bridges. Raised walk ways at the side, drainage or raising the dip in the middle any of these would be a preferable solution. |
Guest |
#122014-02-04 17:37I definitely agree with the raised walkway idea and I have been thinking along similar lines for a solution! |
Guest |
#132014-02-04 18:45Well done for starting the petition, do we know when the tunnel will be pumped? |
Guest |
#152014-02-04 19:48I'd would like to think a detailed examination of the existing structure was made before they started the repairs but yes it obviously needs closer inspection BUT the main priority needs to be a solution to the flooding. Well done on putting this together. |
Cllr Duncan Crow |
#162014-02-04 20:43Good news. Work should be starting this week to fix the drainage issue. http://duncancrow.blogspot.co.uk/2014/02/an-end-in-sight-to-flooded-furnace.html Duncan Crow. West Sussex County Councillor for Tilgate and Furnace Green. Facebook https://www.facebook.com/Tilgate.FurnaceGreen |
Guest |
#182014-02-06 12:00my wife and I feel strongly that the solution is not to pump out the water but in fact FIX the problem. It is obvious that the new bridge is forcing the water into the weakened old bridge and that Network Rail are responsible for the change in water flow patterns. We also thought that whilst they were putting in the lighting in the new bridge they could have repaired the lighting in the original tunnel......not rocket science to think of these things. Also the tunnel has never been prone to flooding before it is only since Network Rail started their works that it has happened |
Tabiba |
#19 Re:2014-02-06 15:43You are right it is very beautiful and we should preserve our historical features, so as long as they can make it safe :) |
Tabiba |
#20 Re:2014-02-06 15:48David, I agree with you. The flood is our primary concern. My fears are that they will keep pumping to avoid a long-term solution, which is our ultimate goal. However, from inspection, many of the parents showed concern of the leakage, therefore; I think while we have the authorities attention we should air our concerns accordingly ain for long- term permanent solution x |
Tabiba |
#21 Re:2014-02-06 15:51Thank you for your comments, I am learning from all your suggestions, they are all very valuable. The flood needs to be dealt with ASAP so that the children are getting across for school on a daily basis. Meantime, NR can work out a formal permanent solution x |
|
PETITION OPPOSING ARROWHEAD AIRPARK IN CASS COUNTY MISSOURI
Keep the Saturday evening jazz concerts at the Roxbury Library
Cancel NPC's Car Park Management Contract in GMV West
Relocate The Shed
📜 PETITION TO THE PARLIAMENTARY COMMITTEE ON THE HEALTH CARE COMPLAINTS COMMISSION (HCCC)
Proclamation for a Restored Republic
STOP THE MINE IN NUNASVAARA
The adoption and ratification of a new calendar for the United Global Trade Organization
Oppose Islamophobia Definition
Bend to the Beach Road Initiative
Petition Against the Installation of a Biodigester at Wilson Rd, Fairfield Township, Madison County, Ohio
Hardworking People Against AB 928
Is there something you want to change?
Change doesn't happen by staying silent. The author of this petition stood up and took action. Will you do the same? Start a social movement by creating a petition.
Start a petition of your ownOther petitions you might be interested in
Justice For Cwecwe
1173766 Created: 2025-03-27
Time period | Number of signatures |
---|---|
All time | 1173766 |
2025 | 1173721 |
Help Mr. Chau Get his job back!!!
804 Created: 2025-03-25
Time period | Number of signatures |
---|---|
All time | 804 |
2025 | 804 |
For the maximum effective sentence for Gabriela Sashova and Krasimir Georgiev, and for legislative changes envisaging harsher penalties for crimes committed against animals!
204322 Created: 2025-03-14
Time period | Number of signatures |
---|---|
All time | 204322 |
2025 | 204312 |
Petition to Provo City Council In Opposition of a Waterpark at Slate Canyon
532 Created: 2025-04-23
Time period | Number of signatures |
---|---|
All time | 532 |
2025 | 532 |
#Justice_For_Cwecwe
92046 Created: 2025-03-29
Time period | Number of signatures |
---|---|
All time | 92046 |
2025 | 92041 |
Stop Wes Moore, and his desperate power grab to change historic tag qualification's.
387 Created: 2025-05-22
Time period | Number of signatures |
---|---|
All time | 387 |
2025 | 387 |
Richard Bong State Recreation Area Class 1 Dog Training Area Requested Change
386 Created: 2025-06-17
Time period | Number of signatures |
---|---|
All time | 386 |
2025 | 386 |
PETITION OPPOSING ARROWHEAD AIRPARK IN CASS COUNTY MISSOURI
351 Created: 2025-04-28
Time period | Number of signatures |
---|---|
All time | 351 |
2025 | 350 |
Life University Student Concerns Over New Attendance Policy
345 Created: 2025-05-28
Time period | Number of signatures |
---|---|
All time | 345 |
2025 | 344 |
Petition to Protect and Preserve St. Joseph County Parks
326 Created: 2025-05-08
Time period | Number of signatures |
---|---|
All time | 326 |
2025 | 326 |
Hardworking People Against AB 928
314 Created: 2025-06-19
Time period | Number of signatures |
---|---|
All time | 314 |
2025 | 314 |
Say No to Data Center destroying our communities!
261 Created: 2025-08-29
Time period | Number of signatures |
---|---|
All time | 261 |
2025 | 261 |
Justice For Cwecwe
33304 Created: 2025-03-28
Time period | Number of signatures |
---|---|
All time | 33304 |
2025 | 33303 |
Stop the Deforestation of Otsego County
236 Created: 2025-01-05
Time period | Number of signatures |
---|---|
All time | 236 |
2025 | 236 |
Stop the destruction of a 3500 year old grave!
977 Created: 2025-01-19
Time period | Number of signatures |
---|---|
All time | 977 |
2025 | 977 |
Stop Industrial Development in North Manheim Township
855 Created: 2024-10-07
Time period | Number of signatures |
---|---|
All time | 855 |
2025 | 208 |
SAVE THE HISTORICAL FORT GATES FERRY
178 Created: 2025-01-15
Time period | Number of signatures |
---|---|
All time | 178 |
2025 | 178 |
Asking Rep. Pete Stauber to hold in person town halls.
162 Created: 2025-02-14
Time period | Number of signatures |
---|---|
All time | 162 |
2025 | 162 |
The removal of the day use fee at our local lakes here surrounding Williams Arizona
158 Created: 2025-05-04
Time period | Number of signatures |
---|---|
All time | 158 |
2025 | 158 |
Deny Modification of Conditions regarding Bonney Bright Sand Company
146 Created: 2025-01-06
Time period | Number of signatures |
---|---|
All time | 146 |
2025 | 146 |